Career and Technical Education (2022) Grade(s): 10-12 - Architecture and Construction
CTE22.AC.EI.16b
Identify a pulling location and set up the cable reels, raceways, and pull line for cable installation.
Identify a pulling location and set up the cable reels, raceways, and pull line for cable installation.