CTE22.AC.ACF.1

Career and Technical Education (2022) Grade(s): 09-12 - Architecture and Construction

CTE22.AC.ACF.1

Prepare a material takeoff and cost estimate for a given project, converting between decimals and percentages as needed.

COS Examples

Examples: Calculate how many pieces of lumber are required for a construction project, building in a 10% error margin to ensure that sufficient materials are on site when needed. Calculate sales tax.

ALSDE LOGO