Career and Technical Education (2022) Grade(s): 09-12 - Architecture and Construction
CTE22.AC.ACF.1
Prepare a material takeoff and cost estimate for a given project, converting between decimals and percentages as needed.
Prepare a material takeoff and cost estimate for a given project, converting between decimals and percentages as needed.
COS Examples
Examples: Calculate how many pieces of lumber are required for a construction project, building in a 10% error margin to ensure that sufficient materials are on site when needed. Calculate sales tax.